Allseas Pioneering Spirit has a current order book for numerous topsides and jacket removals as well as platform installations, added to this are several platform preparations campaigns.
The heavy lift engineer is part of a multidisciplinary team with creative Heavy Lift Engineers, Structural Engineers, Naval Architects and Draftsmen. This team is overseeing the whole project cycle (concept, design and execution), ranging from the heaviest topsides and jacket lifts to date, to associated platform preparations campaigns. Basically all the engineering required for a safe and economical project execution by Allseas heavy lift fleet, utilizing the topsides lift system, jacket lift system, 5000 ton crane and support vessels capabilities.